The Eugene : 3 Manhattan West
1) 3 Manhattan West - 62nd floor terrasse guardrail
Solution
Keep the welded studs as they are, do not disturb the white waterproofing already installed.
Insert an additional non-brittle screw in between each stud, by field drilling +tapping.
Also test all the studs with a pull-test machine. And use a torque-wrench (photo) when tightening the nuts on the studs.
Challenge
While setting the structural channel on this roof terrasse, the threaded studs proved to be brittle and potentially crack if overtorqued.
This was due to too much heat when welding the studs to the steel beam below.
Construction of a 64 floors residential building in the heart of Manhattan. Our scope are the amenities Ornamental Metal and Glass.
2) 3 Manhattan West - exterior stair and elevator shaft
Challenge
Maintain the visual continuity of the glass, align the opaque "spandrel" sections of the glass between the white glass of the elevator and the grey glass of the stair.
A 1" benchmark mistake made the elevator shaft to be 1" too short.
Solution
Precut plywood templates for the stair glass, confirm all shapes, and also where the spandrel should stop and finish up and down.